Hyundai Heavy Industries was in charge of building the FPSO hull(85,000MT),
including living quarters that can accommodate 240 persons.
DB INVOLVEMENT
Pipeline Installation, Testing and Pre-commissioning include Chemical Cleaning, NAS 6 grade oil flushing, Machinery & Equipment Installation Works for the FWD section of the P-78 floating production, storage, and offloading vessel.
The P-78 FPSO forms part of the Búzios field development project offshore Brazil.
It will be the 7th unit to be installed at the Petrobras-operated field in the Santos Basin pre-salt area.
Once operating at the site, the P-78 will be able to process 180,000 barrels per day of oil and 7.2 million cubic meters per day of Natural Gas.
Comments